- Modelling cost‐flow forecasting for water pipeline projects using neural networks. In: Engineering, Construction and Architectural Management, v. 6, n. 3 (März 1999). (1999):
- Neurofuzzy modelling of construction projects' duration II: application. In: Engineering, Construction and Architectural Management, v. 8, n. 2 (Februar 2001). (2001):
- Neurofuzzy modelling of construction projects' duration I: principles. In: Engineering, Construction and Architectural Management, v. 8, n. 2 (Februar 2001). (2001):
- Artificial Neural Networks for Predicting Noise from Construction Sites. In: Building Acoustics, v. 4, n. 3 (September 1997). (1997):
- An expert‐simulation system for construction productivity forecasting. Conformation method used to illustrate the uncertainty associated with expert's knowledge. In: Building Research & Information, v. 24, n. 5 ( 1996). (1996):
- To bid or not to bid: a parametric solution. In: Construction Management and Economics, v. 18, n. 4 (Juni 2000). (2000):
- Simulation of maintenance costs in UK local authority sport centres. In: Construction Management and Economics, v. 22, n. 10 (Dezember 2004). (2004):
- Simulation of maintenance costs in UK local authority sport centres. In: Construction Management and Economics, v. 22, n. 10 (Dezember 2004). (2004):
- Forecasting the residual service life of NHS hospital buildings: a stochastic approach. In: Construction Management and Economics, v. 23, n. 5 (Juni 2005). (2005):
- A neural networks approach for cost flow forecasting. In: Construction Management and Economics, v. 16, n. 4 (Juli 1998). (1998):