Yves Bournand
- Acceptance of stay cable systems using prestressing steels. fédération internationale du béton (fib), Lausanne (Schweiz). (2005):
- Modern equipment for precast bridge construction. Vorgetragen bei: IABSE Symposium: Bridges - Interaction between construction technology and design, Leningrad, USSR, 1991. (1991):
- Development of new stay cable dampers. Vorgetragen bei: IABSE Conference: Cable-Stayed Bridges - Past, Present and Future, Malmö, Sweden, 2-4 June 1999. (1999):
- Experimental analysis of the active tendon control of a large-scale cable-stayed bridge mock-up. Vorgetragen bei: IABSE Conference: Cable-Stayed Bridges - Past, Present and Future, Malmö, Sweden, 2-4 June 1999. (1999):
- Poutres de lancement pour ouvrages d'art préfabriqués. In: Travaux, n. 606 (Januar 1986). (1986):
- Le viaduc Kempis Chuspita, sur l'autoroute Romulo Betancourt, au Vénézula. Vorgetragen bei: La Technique Française du Béton, XIe Congrès de la FIP Hambourg 1990. (1990):
- Le pont d'Uddevalla. In: Travaux, n. 771 (Januar 2001). (2001):