Dean Bierwagen
- First Application of UHPC Bridge Deck Overlay in North America. In: Transportation Research Record: Journal of the Transportation Research Board, v. 2672, n. 26 (20 Juni 2018). (2018):
- Performance Evaluation of Longitudinal Ultrahigh-Performance Concrete Closure Pour Connection for Use in Modular Bridge Construction: Pairwise Comparison of Capacity and Ductility at Failure Limit State. In: Transportation Research Record: Journal of the Transportation Research Board, v. 2592, n. 1 (Januar 2016). (2016):
- Structural Behavior of Waffle Bridge Deck Panels and Connections of Precast Ultra-High-Performance Concrete. Experimental Evaluation. In: Transportation Research Record: Journal of the Transportation Research Board, v. 2251, n. 1 (Januar 2011). (2011):
- Development and Implementation of Precast Paving Notch System for Accelerated Bridge Repair. In: International Journal of Structural and Civil Engineering Research, v. 4, n. 4 ( 2015). (2015):
- Integral Bridge Abutment to Approach Slab Connection. In: Journal of Bridge Engineering (ASCE), v. 18, n. 2 (Februar 2013). (2013):