Sdhabhon Bhokha
- Application of artificial neural network to forecast construction duration of buildings at the predesign stage. In: Engineering, Construction and Architectural Management, v. 6, n. 2 (Februar 1999). (1999):
- Enhancing visualization of 4D CAD model compared to conventional methods. In: Engineering, Construction and Architectural Management, v. 16, n. 4 (Juli 2009). (2009):
- Simplified P-Delta and buckling analysis for inelastic flexibility-based beam-column elements. In: Structural Engineering and Mechanics, v. 33, n. 3 (Oktober 2009). (2009):
- Three-step solutions for cutting stock problem of construction steel bars. In: KSCE Journal of Civil Engineering, v. 18, n. 5 (Mai 2014). (2014):