J. R. Bell
- The boundary-layer characteristics and unsteady flow topology of full-scale operational inter-modal freight trains. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 201 (Juni 2020). (2020):
- A wind-tunnel methodology for assessing the slipstream of high-speed trains. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 166 (Juli 2017). (2017):
- Moving model analysis of the slipstream and wake of a high-speed train. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 136 (Januar 2015). (2015):
- Wind tunnel analysis of the slipstream and wake of a high-speed train. In: Journal of Wind Engineering and Industrial Aerodynamics, v. 134 (November 2014). (2014):
- The First Section of the Kandahar Railway. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 61, n. 1880-3 ( 1880). (1880):
- The Empress Bridge over the Sutlej. In: Minutes of the Proceedings of the Institution of Civil Engineers, v. 65, n. 1881-3 ( 1881). (1881):
- The Principles of River-Training for Railway Bridges, and Their Application to the Case of the Hardinge Bridge over the Lower Ganges at Sara. In: Journal of the Institution of Civil Engineers, v. 10, n. 2 (Dezember 1938). (1938):