R. H. Bassett
- A Stress–Strain Relationship for the Shearing Behaviour of a Sand. In: Géotechnique, v. 15, n. 1 (März 1965). (1965):
- Monitoring and Interpretation of Movement of the Mansion House Due to Tunnelling.. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 107, n. 2 (April 1994). (1994):
- The Heathrow Express Trial Tunnel. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 113, n. 3 (Juli 1995). (1995):
- An automated electrolevel deformation monitoring system for tunnels. In: Proceedings of the Institution of Civil Engineers - Geotechnical Engineering, v. 137, n. 3 (Juli 1999). (1999):
- Plate Friction Load Control Devices – their Application and Potential. In: Proceedings of the Institution of Civil Engineers, v. 55, n. 2 (Juni 1973). (1973):
- Design and Construction of the Approach Embankment to the River Trent Bridge on the M180 South Humberside Motorway. In: Proceedings of the Institution of Civil Engineers, v. 72, n. 3 (August 1982). (1982):
- Coupled lateral-torsional behaviour of frame structures under earthquake loading. In: Earthquake Engineering and Structural Dynamics, v. 20, n. 1 (Januar 1991). (1991):
- Application of a photogrammetric technique to a model tunnel. In: Tunnelling and Underground Space Technology, v. 21, n. 1 (Januar 2006). (2006):