Ismail Basha
- Modelling the performance of pavement marking in cold weather conditions. In: Structure and Infrastructure Engineering, v. 8, n. 11 (November 2012). (2012):
- BOT Viability Model for Large-Scale Infrastructure Projects. In: Journal of Construction Engineering and Management, v. 133, n. 1 (Januar 2007). (2007):
- Performance Evaluating Model for Construction Companies: Egyptian Case Study. In: Journal of Construction Engineering and Management, v. 133, n. 8 (August 2007). (2007):
- The impact on environment of underground infrastructure utility work. In: Structure and Infrastructure Engineering, v. 7, n. 3 (März 2011). (2011):