Gabriel A. Barraza
- Cost Contingency Management. In: Journal of Management in Engineering (ASCE), v. 23, n. 3 (Juli 2007). (2007):
- Probabilistic Monitoring of Project Performance Using SS-Curves. In: Journal of Construction Engineering and Management, v. 126, n. 2 (März 2000). (2000):
- Probabilistic Estimation and Allocation of Project Time Contingency. In: Journal of Construction Engineering and Management, v. 137, n. 4 (April 2011). (2011):
- Probabilistic Forecasting of Project Performance Using Stochastic S Curves. In: Journal of Construction Engineering and Management, v. 130, n. 1 (Februar 2004). (2004):
- Probabilistic Control of Project Performance Using Control Limit Curves. In: Journal of Construction Engineering and Management, v. 133, n. 12 (Dezember 2007). (2007):