S. Baron
- Restrained shrinkage of massive reinforced concrete structures: results of the project CEOS.fr. In: European Journal of Environmental and Civil Engineering, v. 20, n. 7 (Juli 2015). (2015):
- M48 Severn Bridge – main cable inspection and rehabilitation. In: Proceedings of the Institution of Civil Engineers - Bridge Engineering, v. 163, n. 4 (Dezember 2010). (2010):