Michael Anson
- Analytical models towards explaining the difficulty in efficiently matching site concrete supply resources with placing crew needs. In: Engineering, Construction and Architectural Management, v. 26, n. 8 (August 2019). (2019):
- Augmented Balance Point Diagrams for Matching Site and Concrete-Supply Resources. In: Journal of Construction Engineering and Management, v. 146, n. 4 (April 2020). (2020):
- Suitability of the Critical Incident Technique to Measure Quality of Construction Coordination. In: Journal of Management in Engineering (ASCE), v. 20, n. 3 (Juli 2004). (2004):
- Establish Concrete Placing Rates Using Quality Control Records from Hong Kong Building Construction Projects. In: Journal of Construction Engineering and Management, v. 130, n. 2 (April 2004). (2004):
- HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong. In: Journal of Construction Engineering and Management, v. 129, n. 5 (Oktober 2003). (2003):
- Comparison of the concreting productivities in Hong Kong and Beijing and a proposed comparison methodology. In: Construction Management and Economics, v. 18, n. 3 (April 2000). (2000):
- A procedure for quantitatively evaluating site layout alternatives. In: Construction Management and Economics, v. 19, n. 5 (September 2001). (2001):
- A procedure for quantitatively evaluating site layout alternatives. In: Construction Management and Economics, v. 19, n. 5 (September 2001). (2001):
- A procedure for quantitatively evaluating site layout alternatives. In: Construction Management and Economics, v. 19, n. 5 (September 2001). (2001):
- Performance of Concrete Placing in Hong Kong Buildings. In: Journal of Construction Engineering and Management, v. 124, n. 2 (März 1998). (1998):