Erik Yding Andersen
- Re-evaluation of structural load carrying capacities. Vorgetragen bei: IABSE Symposium: Durability of Structures = Durabilité des constructions = Dauerhaftigkeit von Bauwerken, Lisbon, Portugal, 6-8 September 1989. (1989):
- (2014): Puente Nigale Main Bridges: Long Span Precast Segmental Cable Stayed Bridges for Railway and Roadway. Vorgetragen bei: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014.
- Longer…. Vorgetragen bei: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011. (2011):
- Emergency rehabilitation of the Zárate-Brazo Largo Bridges, Argentina. Vorgetragen bei: IABSE Conference: Cable-Stayed Bridges - Past, Present and Future, Malmö, Sweden, 2-4 June 1999. (1999):
- Höga Kusten Bridge (Sweden). Vorgetragen bei: International Conference IABSE-FIP: Ponts suspendus et à haubans = Cable-stayed and suspension bridges, Deauville, France, 12-15 October 1994. (1994):