Konstantinos P. Anagnostopoulos
- Construction Resource Allocation and Leveling Using a Threshold Accepting–Based Hyperheuristic Algorithm. In: Journal of Construction Engineering and Management, v. 138, n. 7 (Juli 2012). (2012):
- A simulated annealing hyperheuristic for construction resource levelling. In: Construction Management and Economics, v. 28, n. 2 (Februar 2010). (2010):
- Public–private partnership projects in Greece: risk ranking and preferred risk allocation. In: Construction Management and Economics, v. 26, n. 7 (Juli 2008). (2008):