Maghsoud Amiri
- Project buffer sizing and dynamic buffer consumption algorithm in power generation construction. In: Engineering, Construction and Architectural Management, v. 29, n. 2 (Mai 2021). (2021):
- A heuristic buffer sizing algorithm for implementing a renewable energy project. In: Automation in Construction, v. 117 (September 2020). (2020):
- (2018): The Ranking of Bridge Design Alternatives: A TOPSIS-FADR Method. In: The Baltic Journal of Road and Bridge Engineering, v. 13, n. 3 (September 2018).