Firat Dogu Akin
- Optimum Finance-Based Scheduling. In: Journal of Construction Engineering and Management, v. 150, n. 9 (September 2024). (2024):
- An advanced decision-support system for ranking unbalanced bids. In: Construction Management and Economics, v. 42, n. 7 (Februar 2024). (2024):