-
Ahmad, Tayyab / Aibinu, Ajibade A. / Ahmed, Dawood (2024): Construction Engineering and Management: Review of Research from Australia-Based Academics. In: Buildings, v. 14, n. 7 (2 Juli 2024).
https://doi.org/10.3390/buildings14071913
-
Mohammadi, Sahra / Aibinu, Ajibade A. / Oraee, Mehran (2024): Risk Allocation and Mitigation Practices for Building Information Modeling: Addressing Legal and Contractual Risks Associated with Contract Documentation. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 2 (Mai 2024).
https://doi.org/10.1061/jladah.ladr-1039
-
Ali, Babar / Aibinu, Ajibade A. / Paton-Cole, Vidal (2024): Improving the Process of Disruption Claims: Identification of the Difficulties and Expectations. In: Journal of Management in Engineering (ASCE), v. 40, n. 1 (Januar 2024).
https://doi.org/10.1061/jmenea.meeng-5536
-
Mohammadi, Sahra / Aibinu, Ajibade A. / Oraee, Mehran (2024): Legal and Contractual Risks and Challenges for BIM. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 16, n. 1 (Februar 2024).
https://doi.org/10.1061/jladah.ladr-1040
-
Oliveros-Romero, Jose / Aibinu, Ajibade A. (2023): Ex-post impact evaluation of PPP projects from multiple stakeholder perspectives: a toll road case. In: Built Environment Project and Asset Management, v. 13, n. 4 (Juni 2023).
https://doi.org/10.1108/bepam-03-2022-0039
-
Ali, Babar / Aibinu, Ajibade A. / Paton-Cole, Vidal (2023): Unearthing the Difficulties in the Information Management of Disruption Claims. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (Mai 2023).
https://doi.org/10.1061/jladah.ladr-934
-
Aibinu, Ajibade A. / Paton-Cole, Vidal (2023): Project and Regulatory Control Strategies for Minimizing and Resolving Defects and Conflicts in the Low-Rise Residential Home-Building Process. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (Mai 2023).
https://doi.org/10.1061/jladah.ladr-913
-
Ali, Babar / Aibinu, Ajibade A. / Paton-Cole, Vidal (2022): Closing the information gaps: a systematic review of research on delay and disruption claims. In: Construction Innovation, v. 24, n. 3 (Dezember 2022).
https://doi.org/10.1108/ci-04-2022-0080
-
Paton-Cole, Vidal P. / Aibinu, Ajibade A. (2021): Construction Defects and Disputes in Low-Rise Residential Buildings. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 13, n. 1 (Februar 2021).
https://doi.org/10.1061/(asce)la.1943-4170.0000433
-
Aibinu, Ajibade A. / Dassanayake, Dharma / Chan, Toong-Khuan / Thangaraj, Ram (2015): Cost estimation for electric light and power elements during building design. A neural network approach. In: Engineering, Construction and Architectural Management, v. 22, n. 2 (März 2015).
https://doi.org/10.1108/ecam-01-2014-0010
-
Fageha, Mohammed K. / Aibinu, Ajibade A. (2016): Identifying stakeholders’ involvement that enhances project scope definition completeness in Saudi Arabian public building projects. In: Built Environment Project and Asset Management, v. 6, n. 1 (Februar 2016).
https://doi.org/10.1108/bepam-06-2014-0030
-
Ahmad, Tayyab / Aibinu, Ajibade A. (2017): Project delivery attributes influencing green building project outcomes. A review and future research directions. In: Built Environment Project and Asset Management, v. 7, n. 5 (November 2017).
https://doi.org/10.1108/bepam-11-2016-0066
-
Aibinu, Ajibade A. / Koch, Fernando / Thomas Ng, S. (2019): Data analytics and big data in construction project and asset management. In: Built Environment Project and Asset Management, v. 9, n. 4 (September 2019).
https://doi.org/10.1108/bepam-09-2019-139
-
Oliveros-Romero, Jose / Aibinu, Ajibade A. (2019): Ex post impact evaluation of PPP projects: an exploratory research. In: Built Environment Project and Asset Management, v. 9, n. 2 (Juni 2019).
https://doi.org/10.1108/bepam-01-2018-0036
-
Fageha, Mohammed K. / Aibinu, Ajibade A. (2014): Prioritising Project Scope Definition Elements in Public Building Projects. In: Australasian Journal of Construction Economics and Building, v. 14, n. 3 (September 2014).
https://doi.org/10.5130/ajceb.v14i3.4155
-
Aibinu, Ajibade A. / Papadonikolaki, Eleni (2020): Conceptualizing and operationalizing team task interdependences: BIM implementation assessment using effort distribution analytics. In: Construction Management and Economics, v. 38, n. 5 (28 März 2020).
https://doi.org/10.1080/01446193.2019.1623409
-
Shrestha, Asheem / Chan, Toong-Khuan / Aibinu, Ajibade A. / Chen, Chuan / Martek, Igor (2018): Risk Allocation Inefficiencies in Chinese PPP Water Projects. In: Journal of Construction Engineering and Management, v. 144, n. 4 (April 2018).
https://doi.org/10.1061/(asce)co.1943-7862.0001457
-
Hosseini, M. Reza / Martek, Igor / Zavadskas, Edmundas Kazimieras / Aibinu, Ajibade A. / Arashpour, Mehrdad / Chileshe, Nicholas (2018): Critical evaluation of off-site construction research: A Scientometric analysis. In: Automation in Construction, v. 87 (März 2018).
https://doi.org/10.1016/j.autcon.2017.12.002
-
Shrestha, Asheem / Chan, Toong-Khuan / Aibinu, Ajibade A. / Chen, Chuan / Martek, Igor (2017): Risks in PPP Water Projects in China: Perspective of Local Governments. In: Journal of Construction Engineering and Management, v. 143, n. 7 (Juli 2017).
https://doi.org/10.1061/(asce)co.1943-7862.0001313