Xufeng Ai
- First application of mechanized method using earth pressure balance TBM with large horseshoe-shaped cross section to loess mountain tunnel: A case study of Baicheng tunnel. In: Tunnelling and Underground Space Technology, v. 126 (August 2022). (2022):
- Experimental and numerical investigation on overbreak control considering the influence of initial support in tunnels. In: Tunnelling and Underground Space Technology, v. 115 (September 2021). (2021):