- Simulation-Based Stress Tests: Integrated Simulation Approach for Assessing Resilience of Transport Systems under Multiple Stressors. In: Journal of Infrastructure Systems, v. 30, n. 3 (September 2024). (2024):
- Probabilistic Models to Evaluate Effectiveness of Steel Bridge Weld Fatigue Retrofitting by Peening. In: Transportation Research Record: Journal of the Transportation Research Board, v. 2285, n. 1 (Januar 2012). (2012):
- A preliminary investigation of the potential benefits of using the ASTRA Bridge for short-span bridge deck refurbishment projects in Switzerland. In: Structure and Infrastructure Engineering, v. 20, n. 11 (25 Juni 2024). (2024):
- Required accuracy of information when determining optimal railway intervention programmes. In: Infrastructure Asset Management, v. 9, n. 1 (März 2022). (2022):
- Quantifying net benefits of intervention programmes to enable their digitalised generation. In: Infrastructure Asset Management, v. 8, n. 3 (September 2021). (2021):
- Using Bayesian Networks to Estimate Bridge Characteristics in Early Road Designs. In: Infrastructure Asset Management, v. 9, n. 1 (März 2022). (2022):
- Quantitative investigation on the accuracy and precision of Scan-to-BIM under different modelling scenarios. In: Automation in Construction, v. 126 (Juni 2021). (2021):
- Use of Unmanned Aerial Vehicle Photogrammetry to Obtain Topographical Information to Improve Bridge Risk Assessment. In: Journal of Infrastructure Systems, v. 24, n. 1 (März 2018). (2018):
- Sustainable funding strategies for stormwater infrastructure management: A system dynamics model. In: Sustainable Cities and Society, v. 64 (Januar 2021). (2021):
- Usefulness of quantifying effects on rail service when comparing intervention strategies. In: Infrastructure Asset Management, v. 7, n. 3 (September 2020). (2020):
- A road infrastructure asset management process: gains in efficiency and effectiveness. In: Infrastructure Asset Management, v. 6, n. 1 (März 2019). (2019):
- Supplier-contractor coordination approach to managing demand fluctuations of ready-mix concrete. In: Automation in Construction, v. 121 (Januar 2021). (2021):
- Prioritizing Preproject Planning Activities Using Value of Information Analysis. In: Journal of Management in Engineering (ASCE), v. 36, n. 5 (September 2020). (2020):
- Using look-ahead plans to improve material flow processes on construction projects when using BIM and RFID technologies. In: Construction Innovation, v. 20, n. 3 (Juni 2020). (2020):
- Prioritizing transportation network recovery using a resilience measure. In: Sustainable and Resilient Infrastructure, v. 7, n. 1 (Februar 2020). (2020):
- A surprising theorem to reduce the mathematical complexity of an important class of infrastructure maintenance problems. In: Sustainable and Resilient Infrastructure, v. 7, n. 1 (Februar 2020). (2020):
- A Real Option Approach To Determine Optimal Intervention Windows for Multi-national Rail Corridors. In: Journal of Civil Engineering and Management, v. 22, n. 1 (Dezember 2015). (2015):
- Using real option methods as a tool to determine optimal building work programs. In: Structure and Infrastructure Engineering, v. 12, n. 11 (November 2016). (2016):
- Total Cost-Benefit Analysis of Alternative Corrosion Management Strategies for a Steel Roadway Bridge. In: Journal of Bridge Engineering (ASCE), v. 18, n. 4 (April 2013). (2013):
- Productivity of digital fabrication in construction: Cost and time analysis of a robotically built wall. In: Automation in Construction, v. 92 (August 2018). (2018):