- A Comprehensive Categorization and Flowcharting for Schedule Delay Analysis Methods. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 17, n. 1 (Februar 2025). (2025):
- Leveraging convolutional neural networks for efficient classification of heavy construction equipment. In: Asian Journal of Civil Engineering, v. 25, n. 8 (24 September 2024). (2024):
- Integration of BIM data and real-time game engine applications: Case studies in construction safety management. In: Journal of Information Technology in Construction, v. 29 (Februar 2024). (2024):
- Predicting energy consumption of mosque buildings during the operation stage using deep learning approach. In: Energy and Buildings, v. 303 (Januar 2024). (2024):
- Barriers and Recommendations for Right-of-Way Acquisition Process. In: Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, v. 15, n. 2 (Mai 2023). (2023):
- Monitoring thermal comfort in subways using building information modeling. In: Energy and Buildings, v. 84 (Dezember 2014). (2014):
- Estimating Preconstruction Services for Bridge Design Projects. In: Journal of Management in Engineering (ASCE), v. 36, n. 4 (Juli 2020). (2020):
- Dynamic Pavement Delineation and Visualization Approach Using Data Mining. In: Journal of Computing in Civil Engineering, v. 32, n. 4 (Juli 2018). (2018):
- BIM-based framework for managing performance of subway stations. In: Automation in Construction, v. 41 (Mai 2014). (2014):
- Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects. In: Construction Management and Economics, v. 34, n. 10 (August 2015). (2015):