Saman Abbasi
- BIM-based optimization approach to reduce life cycle costs by focusing on the integration of construction and operation phases in office-commercial buildings. In: Journal of Building Engineering, v. 98 (Dezember 2024). (2024):
- BIM-Based Combination of Takt Time and Discrete Event Simulation for Implementing Just in Time in Construction Scheduling under Constraints. In: Journal of Construction Engineering and Management, v. 146, n. 12 (Dezember 2020). (2020):