Bent Aagaard
- Permanent tunnel support with reinforced shotcrete arches and forepoling in over-consolidated till and weathered rock. A case study based on the construction of the Bergås tunnel, Norway. In: Tunnelling and Underground Space Technology, v. 157 (März 2025). (2025):
- Spiling bolts and reinforced ribs of sprayed concrete replace concrete lining. In: Tunnelling and Underground Space Technology, v. 17, n. 4 (Oktober 2002). (2002):