Tintagel Castle Bridge
-
Hamlyn, David / Nguyen, Tung (2024): Climate Resilience of Long-span Bridges through Early-stage Aerodynamic and Climate Consulting. Vorgetragen bei: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, S. 1348-1357.
https://doi.org/10.2749/manchester.2024.1348
-
Mallié, Matthieu / Bols, Bart / Ney, Laurent / Matthews, William (2021): Design and construction of Tintagel Castle footbridge in Cornwall, UK. In: Proceedings of the Institution of Civil Engineers - Civil Engineering, v. 174, n. 3 (August 2021), S. 1-27.
https://doi.org/10.1680/jcien.20.00071
-
Maas, Toon / Tuffaha, Mohamad / Ney, Laurent (2022): Footbridges as an important part of a system: the context as an experience. Vorgetragen bei: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
https://doi.org/10.24904/footbridge2022.227
-
Bols, Bart / Mallié, Matthieu / Ney, Laurent (2022): Tintagel Footbridge. Void for Imagination. Vorgetragen bei: Footbridge 2022: Creating Experience, Madrid, Spain, 07-09 September 2022.
https://doi.org/10.24904/footbridge2022.096