Marmaray-Tunnel
-
Gokce, Ahmet / Koyama, Fumio / Tsuchiya, Masahiko / Gencoglu, Turgut (2009): The challenges involved in concrete works of Marmaray immersed tunnel with service life beyond 100 years. In: Tunnelling and Underground Space Technology, v. 24, n. 5 (September 2009), S. 592-601.
https://doi.org/10.1016/j.tust.2009.01.001
-
Sakaeda, Hideki (2005): Marmaray project: Tunnels and stations in BC contract. In: Tunnelling and Underground Space Technology, v. 20, n. 6 (November 2005), S. 612-616.
https://doi.org/10.1016/j.tust.2005.08.007
-
Brighenti, Luigi / Sigismondo, Monica (2016): Nuovi Collegamenti sul Bosforo. In: Strade e Autostrade, v. 20, n. 119 (September 2016), S. 62.
-
Dikmen, S. U. (2016): Response of Marmaray Submerged Tunnel during 2014 Northern Aegean Earthquake (Mw=6.9). In: Soil Dynamics and Earthquake Engineering, v. 90 (November 2016), S. 15-31.
https://doi.org/10.1016/j.soildyn.2016.08.006