Dunajecsteg
-
Biliszczuk, Jan / Hawryszków, Paweł / Sulkowski, Mariusz / Maury, Adam (2008): Cable-Stayed Footbridge Made of Glued-Laminated Wood Erected in Sromowce Nizne, Poland. Vorgetragen bei: Footbridge 2008 - Footbridges for Urban Renewal, Third International Conference on Footbridges, 2-4 July 2008, Porto, Portugal, S. 237-238.
-
Biliszczuk, Jan / Hawryszków, Paweł / Maury, Adam / Sulkowski, Mariusz / Wegrzyniak, Mieczysław (2007): A cable-stayed footbridge made of glued-laminated wood – design, erection and experimental investigations. Vorgetragen bei: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, S. 338-341.
https://doi.org/10.2749/222137807796158174
-
Biliszczuk, Jan / Hawryszków, Paweł / Maury, Adam / Sulkowski, Mariusz: Design of a cable-stayed footbridge with deck made of glued-laminated wood. Vorgetragen bei: Conference on bridges .
-
Russell, Lisa (2006): Elegant footbridge connects border resorts. In: Bridge Design & Engineering, v. 12, n. 45 (4. Quartal 2006), S. 8.
-
Bryja, Danuta / Woszczyna, Anna (2011): Resonant Vibrations of a Cable-Stayed Footbridge Under Gusty Wind With Time Dependent Periodic Mean Velocity. Vorgetragen bei: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011.