Diabolo-Eisenbahntunnel
-
Schotte, Ken / De Backer, Hans / Nuttens, Timothy / De Wulf, Alain / Van Bogaert, Philippe (2010): Strain Gauge Measurements during the Assembly of the Diabolo Tunnel. Vorgetragen bei: IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010, S. 626-627.
https://doi.org/10.2749/222137810796062978
-
Schotte, Ken / De Backer, Hans / Nuttens, Timothy / De Wulf, Alain / Van Bogaert, Philippe (2013): Verification of the performance of the precast concrete lining in the Diabolo Tunnel and Liefkenshoek Rail Tunnel. Vorgetragen bei: IABSE Conference: Assessment, Upgrading and Refurbishment of Infrastructures, Rotterdam, The Netherlands, 6-8 May 2013, S. 280-281.
https://doi.org/10.2749/222137813806478981