Ligne circulaire du Métro de Copenhague
-
Rabensteiner, Klaus / Notarianni, Sergio (2013): Cityringen - Extension of the Copenhagen Metro / Cityringen - Ausbau der Metro Kopenhagen. Dans: Geomechanics and Tunnelling, v. 6, n. 5 ( 2013), pp. 542-550.
https://doi.org/10.1002/geot.201300046
-
Eskesen, Søren Degn / Paulatto, Enrico / Stubbs, Jared (2014): Construction challenges for urban tunnelling - The Copenhagen Metro Circle Line. Dans: Geomechanics and Tunnelling, v. 7, n. 3 ( 2014), pp. 223-229.
https://doi.org/10.1002/geot.201400017
-
d'Angella, Paolo / Fronterrè, Michele (2019): Il Copenaghen Cityringen: la validazione del TVS. Dans: Strade e Autostrade, v. 23, n. 136 (juillet 2019), pp. 108-109.
-
Saltmarsh, Russell / Martini, Neil: Extending Cityringen – the challenges involved. Dans: Proceedings of the Institution of Civil Engineers - Transport, pp. 1-11.
https://doi.org/10.1680/jtran.18.00026
-
Schoof, Jakob (2019): Kreisverkehr XXL: Cityring in Kopenhagen. Super-Sized Metro Loop: Cityringen in Copenhagen. Dans: structure, v. 5, n. 2 ( 2019), pp. 4-5.