0
  • DE
  • EN
  • FR
  • Base de données et galerie internationale d'ouvrages d'art et du génie civil

Publicité

Calculation and construction study for the Novel Twin-Deck Cable- Stayed Bridge with shared pylon

 Calculation and construction study for the Novel Twin-Deck Cable- Stayed Bridge with shared pylon
Auteur(s): ,
Présenté pendant IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, publié dans , pp. 343-349
DOI: 10.2749/christchurch.2021.0343
Prix: € 25,00 incl. TVA pour document PDF  
AJOUTER AU PANIER
Télécharger l'aperçu (fichier PDF) 0.2 MB

Twin-deck cable-stayed bridge with shared pylon (TDBSP) is an innovative structural arrangement captured with complex mechanical performance and highly interaction effect between two bridges, as th...
Lire plus

Détails bibliographiques

Auteur(s): (Shanghai Tonghao Civil Engineering Consulting Co., Ltd., Shanghai 200092, China; Department of Bridge Engineering, Tongji University, Shanghai 200092, China)
(Department of Bridge Engineering, Tongji University, Shanghai 200092, China)
Médium: papier de conférence
Langue(s): anglais
Conférence: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Publié dans:
Page(s): 343-349 Nombre total de pages (du PDF): 7
Page(s): 343-349
Nombre total de pages (du PDF): 7
DOI: 10.2749/christchurch.2021.0343
Abstrait:

Twin-deck cable-stayed bridge with shared pylon (TDBSP) is an innovative structural arrangement captured with complex mechanical performance and highly interaction effect between two bridges, as the deck layouts are asymmetrical and two bridges share one merged pylon leg. This paper explores the calculation and construction methods of TDBSP, based on the record-breaking Rod El Farag Axis Bridge. Single-beam model (SBM) and beam-plate model (BPM) are firstly established, and the numerical results are compared with field surveys as validations. Then, the interaction effect of two bridges during construction are studied, and a comparison of synchronous construction method (SCM) and asynchronous construction method (ASCM) are investigated during the construction of TDBSP.