Auteur(s): |
Jose M. Rodriguez
Nat B. Kasbekar |
---|---|
Médium: | article de revue |
Langue(s): | anglais |
Publié dans: | Civil Engineering Magazine, juin 2005, n. 6, v. 75 |
Page(s): | 50-57 |
DOI: | 10.1061/ciegag.0000023 |
Abstrait: |
New Jerseys first concrete segmental bridge, the Victory Bridge, replaces an aging swing bridge with a twin concrete box girder crossing that sets a U.S. record for match-cast segments. By using a carefully staged construction sequence, the first of the parallel structures was built adjacent to the existing bridge in just 15 months. Superstructure erection of the remaining crossing was completed in just nine months. |
Ouvrages et projets
- Informations
sur cette fiche - Reference-ID
10020256 - Publié(e) le:
23.07.2005 - Modifié(e) le:
01.12.2018