0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: January 2019
Completion: June 2019
Duration of works: 5 months
Status: in use

Project Type

Structure: Rigid frame bridge
Support conditions:
Function / usage: Road bridge
Material: Steel-prestressed concrete composite bridge

Location

Location: , , ,
Address: Speelberger Straße
Crosses: A 3 Motorway (Germany) (1984)
Coordinates: 51° 51' 38.46" N    6° 16' 15.06" E
Show coordinates on a map

Technical Information

Dimensions

width 8.80 m
total length 58.52 m
span 39.60 m
bridge surface 515 m²
deck deck depth 1.18 - 2.51 m

Quantities

structural steel 70 t
concrete volume 1 185 m³
prestressing steel 6 t
reinforcing steel 76 t

Cost

cost of construction Euro 3 000 000

Materials

deck slab precast prestressed concrete (C 60/75)
abutments reinforced concrete
girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • Wellner, Sabine (2020): Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 9./10. März 2020, Dresden (Germany), pp. 227.
  • About this
    data sheet
  • Structure-ID
    20077170
  • Published on:
    04/04/2019
  • Last updated on:
    10/06/2022
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine