0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2017
Completion: 2019
Status: project phase

Project Type

Location

Location: , ,
Replaces: Old Mangere Bridge (1914)
Coordinates: 36° 56' 2.21" S    174° 47' 11.99" E
Show coordinates on a map

Technical Information

Dimensions

total length 250 m
span lengths 2 x 23 m - 21 m - 60 m - 21 m - 4 x 23 m - 17.9 m
deck width 8 m
number of spans 10
main bridge
arch rise ca. 12 m
span 60 m
northern approach viaduct
length 67 m
southern approach viaduct
length 130 m

Materials

piers reinforced concrete
deck of main span steel
arch steel
deck of approach viaducts concrete
deck slab concrete

Participants

Client
Design
Architecture

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20074162
  • Published on:
    10/11/2017
  • Last updated on:
    20/11/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine