0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Hung Hom North Approach Tunnels

General Information

Beginning of works: 2012
Completion: 2018
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Metro tunnel / subway tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
, ,
Part of:
Coordinates: 22° 18' 15.67" N    114° 10' 56.44" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20070955
  • Published on:
    10/03/2016
  • Last updated on:
    10/03/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine