0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1965
Completion: 1967
Status: in use

Project Type

Location

Location: , , ,
Address: Freiburger Straße
Coordinates: 48° 7' 3.81" N    7° 51' 6.74" E
Show coordinates on a map

Technical Information

Dimensions

total length 267.825 m
span lengths 21.30 m - 25.60 m - 7 x 28.20 m - 23.525 m
number of spans 10
bridge surface 3 080 m²
superstructure deck depth 1.37 m
deck width 11.50 m
total width 12.00 m
roadway / carriageway width 8.50 m

Quantities

concrete volume 0.650 m³/m²
prestressing steel 24.0 kg/m²
reinforcing steel content 32.5 kg/m²

Cost

cost of construction German Mark 1 980 000
cost of construction per m² German Mark 650

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Design
Structural engineering
Contractor

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20077096
  • Published on:
    24/03/2019
  • Last updated on:
    24/03/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine