Erster Bauabschnitt der Eisenbahnüberführung Peeneklappbrücke in Anklam

Author(s):

Medium: journal article
Language(s): German
Published in: Stahlbau, , n. 10, v. 81
Page(s): 757-765
DOI: 10.1002/stab.201201608
Abstract:

First stage of construction of the railway overpass Peeneklappbrücke in Anklam, Germany - Dismantling and erection of the steel superstructure.

The 1938 constructed Eisenbahnüberführung Peeneklappbrücke Anklam is part of the railroad No. 6081 connecting Berlin with Stralsund. Within the development of the double tracked railroad into a European high speed route the four bridge structures (two bascule bridge, two trough bridges) are removed and substituted by new structures, which are in accordance with today's requirements. One of the heritage-protected old moveable bridges will be reassembled as a monument next to the new constructed bridges. At this time the first construction stage has been finished and the operations for the second construction stage are processing. When the works will be finished next year, it will be possible to drive at a speed of 120 km/h on the new railway bridges.

Keywords:
protection of monuments bascule bridge high speed route trough bridge retreating work
Available from: Refer to publisher
Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/stab.201201608.
  • About this
    data sheet
  • Reference-ID
    10067624
  • Published on:
    29/03/2013
  • Last updated on:
    13/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine