0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Bauen im Bestand: Bauablauf und Projektsteuerung am Beispiel eines Hotelprojekts in der Sächsischen Schweiz

Author(s):

Medium: journal article
Language(s): German
Published in: Bautechnik, , n. 4, v. 85
Page(s): 288-293
DOI: 10.1002/bate.200890048
Available from: Refer to publisher

Structures and Projects

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.1002/bate.200890048.
  • About this
    data sheet
  • Reference-ID
    10032918
  • Published on:
    23/01/2009
  • Last updated on:
    15/08/2014
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine