0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Key technology for the construction of distributed pressure slurry extra-long pile foundation in Yellow River Wetland Reserve

 Key technology for the construction of distributed pressure slurry extra-long pile foundation in Yellow River Wetland Reserve
Author(s): , ,
Presented at IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022, published in , pp. 1008-1014
DOI: 10.2749/nanjing.2022.1008
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.15 MB

In view of a series of pile foundation construction problems such as the high environmental protection requirements of the Yellow River Wetland Nature Reserve, the first application of distributed ...
Read more

Bibliographic Details

Author(s): (CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
(CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
(CCCC Second Harbor Engineering Co.Ltd., Wuhan, China)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022
Published in:
Page(s): 1008-1014 Total no. of pages: 7
Page(s): 1008-1014
Total no. of pages: 7
DOI: 10.2749/nanjing.2022.1008
Abstract:

In view of a series of pile foundation construction problems such as the high environmental protection requirements of the Yellow River Wetland Nature Reserve, the first application of distributed post-grouting technology in China, and the difficulty in implementing the traditional method of removing steel casings, this project creatively developed a self-circulating mud system; using distributed Post-grouting technology, the grouting tube and the acoustic measuring tube are combined into one, the pile side and pile end are grouted simultaneously, and the intelligent construction technology is used to monitor and control the grouting process in real time; by using the air compressor air cap technology Remove the steel guard. Finally, the construction of 72 pile foundations of the main bridge was realized, which provided a reference for the construction of pile foundations of the same type, especially the Yellow River Wetland Nature Reserve.

Keywords:
pile foundation pump suction reverse circulation distributed grouting gas cap
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.