0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Ruhrbrücke Witten-Bommern
Beginning of works: 1995
Completion: 1996
Duration of works: 5 months
Status: in use

Project Type

Structure: Triple girder bridge
Function / usage: Road bridge
Material: Steel bridge
Construction method: Lateral / transverse launching

Location

Location: , , ,
Address: Ruhrstraße
Crosses:
  • Ruhr River
Replaces: Witten-Bommern Bridge (1936)
Coordinates: 51° 25' 37.90" N    7° 20' 6.75" E
Show coordinates on a map

Technical Information

Materials

girders steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20018124
  • Published on:
    15/10/2005
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine