• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Wellen-Grevenmacher Bridge

General Information

Beginning of works: 2012
Completion: 16 October 2013
Status: in use

Project Type

Structure: Arch bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: ,
, , ,
Crosses:
  • Mosel River
Replaces: Grevenmacher Bridge (1955)
Coordinates: 49° 40' 32.58" N    6° 26' 37.82" E

Technical Information

Dimensions

main span 113.80 m
total length 213 m
span lengths 34.32 m - 29.395 m - 113.795 m - 34.995 m
total width 17.145 m
roadway / carriageway width 2 × 3.50 m
walkway width 2 × 2.00 m
arch
rise 14 m

Quantities

structural steel 2 000 t
concrete volume 800 m³

Cost

construction cost (without tax) Euro 12 000 000

Materials

arch steel

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20065923
  • Date created
    31/01/2014
  • Last Update
    21/07/2016