0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1954
Status: in use

Project Type

Structure: Gravity dam
Function / usage: Hydroelectric dam / plant
Material: Concrete dam

Location

Location: ,
Coordinates: 49° 0' 14.10" N    117° 36' 42.90" W
Show coordinates on a map

Technical Information

Dimensions

height 12 m

Excerpt from Wikipedia

The Waneta Dam is a concrete gravity-type hydroelectric dam on the Pend d'Oreille River in the Canadian province of British Columbia. It lies 9.5 kilometres (6 mi) downstream of Seven Mile Dam at the Pend d'Oreille's confluence with the Columbia River. It is located about 12.5 kilometres (8 mi) southeast of Trail and 0.35 kilometres (0.2 mi) north of the U.S. border at Washington.

It supplies electric power to Teck Resources metallurgical operations at Trail, British Columbia and for BC Hydro which since 2010 has a 1/3 ownership of the facility. It is located near the mouth of the Pend d'Oreille River just before it empties into the Columbia River, slightly north of the Canada–United States border. The powerplant currently has four units and has a capacity of 450 megawatts.

BC Hydro Purchase

In 2010, BC Hydro purchased a one-third interest in the Waneta Dam from Teck Resources for a price of $825 million

On August 1st, 2017, BC Hydro announced its intention to purchase the remaining two-thirds interest in the dam from Teck for a price of $1.2 billion.. Teck's Trail, British Columbia smelter will continue to use two-thirds of the electricity generated by the dam, continuing the terms of the previous agreement.

As of Spring 2018, the sale of the remaining two-thirds is subject to review and approval from the BC Utilities Commission.

Waneta Expansion

Construction of a separate two-unit powerplant commenced in Winter of 2010/11 to increase the dam's generating capacity by an additional 335 megawatts. This project, Waneta Expansion, is a partnership, with Fortis Inc. Holding a 51% share in the project and the two Crown agencies Columbia Power Corporation and Columbia Basin Trust holding a 32.5% and 16.5% share, respectively. SNC-Lavalin designed and built the project which came online in 2015.

Text imported from Wikipedia article "Waneta Dam" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20041606
  • Published on:
    24/12/2008
  • Last updated on:
    24/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine