0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2017
Status: in use

Project Type

Structure: main bridge:
Tied-arch bridge with inclined hangers
approach viaduct:
Quadruple T-section girder bridge
southern approach viaduct:
Twin girder bridge
southern approach viaduct:
Haunched girder bridge
Function / usage: High-speed rail bridge
Material: Structurae Plus/Pro - Subscribe Now!
approach viaduct:
Reinforced concrete bridge
southern approach viaduct:
Steel-reinforced concrete composite bridge
Construction method: main bridge:
Longitudinal launching
approach viaduct:
Precast girders with cast-in-situ slab
southern approach viaduct:
Longitudinal launching

Location

Location: , , ,
Crosses:
  • Lez River
Part of:
Coordinates: 43° 35' 16.82" N    3° 54' 26.59" E
Show coordinates on a map

Technical Information

Dimensions

total length 576.4 m
bridge surface 7 800 m²
number of tracks 2
abutments number 2
piers number 15
piles diameter 1.2 m
length 25 - 30 m
number 194
precast elements (RC) number 44
approach viaduct PC12-PC15
span lengths 28.5 m - 31.4 m - 21 m
approach viaduct PC4-PC6
span lengths 2 x 28 m
number of spans 2
approach viaduct PC6-PC9
span lengths 3 x 28 m
number of spans 3
approach viaduct PC9-PC12
span lengths 3 x 28.5 m
number of spans 3
main bridge PC15-C16
rise 17.5 m
span 90 m
southern approach viaduct C0-PC4
total length 180 m
span lengths 39 m - 2 x 51 m - 39 m
on-center distance between girders 7.87 m
girder depth 2.65 - 3.50 m

Quantities

concrete volume 15 000 m³
reinforcing steel 2 600 t
main bridge PC15-C16
structural steel 1 600 t
southern approach viaduct C0-PC4
structural steel 800 t

Design Loads

design speed 350 km/h

Materials

piers reinforced concrete
arches steel
abutments reinforced concrete

Participants

Conceding authority
Concessionaire
Special foundations
Reinforcing steel

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20072648
  • Published on:
    01/03/2017
  • Last updated on:
    25/09/2018
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine