0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1973
Completion: 1977
Status: in use

Project Type

Structure: Box girder bridge
Function / usage: Road bridge
Material: Prestressed concrete bridge
Construction method: Balanced cantilever method

Location

Location: , ,
Coordinates: 48° 9' 38.05" N    17° 52' 49.54" E
Show coordinates on a map

Technical Information

Dimensions

total length 315 m
span lengths 30 m - 4 x 60 m - 30 m
number of spans 6

Materials

deck prestressed concrete

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20009768
  • Published on:
    02/08/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine