• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Untersammelsdorf Tunnel

General Information

Beginning of works: Summer 2016
Status: project phase

Project Type

Structure: Tunnel
Function / usage: Railroad (railway) tunnel
Construction method: Wall-cover construction method
Cut-and-cover method

Location

Location: , ,
Part of:
Coordinates: 46° 37' 34.38" N    14° 34' 39.17" E
Coordinates: 46° 37' 33.79" N    14° 35' 25.90" E

Technical Information

Dimensions

length 665 m
number of tracks 2 × 1
length of bored tunnels 617 m

Participants

Owner
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20070628
  • Date created
    02/02/2016
  • Last Update
    02/02/2016