0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: January 2008
Completion: October 2010
Status: in use

Project Type

Location

Location: , ,
Crosses:
  • Lech River
Coordinates: 48° 22' 34.44" N    10° 54' 48.56" E
Show coordinates on a map

Technical Information

Dimensions

main span 75 m
total length 136 m
deck width 29.30 m

Cost

cost of construction Euro 15 500 000

Participants

Contractor

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20023132
  • Published on:
    29/09/2006
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine