Advertisement

Share

Follow

Donate

Taxiway Bridge West 1

General Information

Beginning of works: 2009
Completion: 2011
Status: in use

Project Type

Function / usage: Taxiway bridge
Construction method: Precast girders with cast-in-situ slab
Material: Prestressed concrete bridge

Location

Location: , , ,
Address: A 3
Part of:
Coordinates: 50° 2' 8.18" N    8° 30' 56.63" E
Show coordinates on a map

Technical Information

Dimensions

width ca. 82 m
total length ca. 80 m
span lengths ca. 2 × 25 m - 30 m

Materials

deck slab prestressed concrete
girders precast prestressed concrete

Advertisement

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20058726
  • Date created
    31/10/2010
  • Last Update
    05/02/2016