• de
  • en
  • fr
  • International Database and Gallery of Structures

Svindersviksbron

General Information

Beginning of works: Summer 2013
Completion: 21 June 2016
Status: in use

Project Type

Structure: Through arch bridge
Function / usage: Road bridge
Construction method: Longitudinal launching
Material: Steel bridge

Location

Location: , ,
Connects to: Ryssbergstunneln (2016)
Coordinates: 59° 18' 56.50" N    18° 8' 50.93" E

Technical Information

Dimensions

arch span 140 m

Materials

arches steel
deck slab reinforced concrete
cross beams steel
main girders steel

Participants

Architecture
Structural engineering

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20071628
  • Date created
    27/09/2016
  • Last Update
    27/09/2016