0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 1986
Status: in use

Project Type

Function / usage: Opera house
City or town hall

Location

Location: , ,
Coordinates: 52° 22' 2.81" N    4° 54' 4.69" E
Show coordinates on a map

Technical Information

There currently is no technical data available.

Excerpt from Wikipedia

The Stopera is a building complex in Amsterdam, Netherlands, housing both the city hall of Amsterdam and the Dutch National Opera and Ballet, the principal opera house in Amsterdam that is home of Dutch National Opera, Dutch National Ballet and Holland Symfonia. The building was designed by Wilhelm Holzbauer and Cees Dam.

The name is an abbreviation of the protest slogan "Stop the Opera" and not a portmanteau of "st"adhuis (Dutch: "city hall") and "opera" as is often claimed. Because the word 'Stopera' was a name for the protests against the building, the theater has never used this name in their communication.

The Stopera is located in the center of Amsterdam at a bend of the Amstel River between Waterlooplein Square and the Zwanenburgwal Canal, on a plot of land called Vlooienburg, which was reclaimed in the 16th century. The opera house building is shaped like a huge, massive block, with a curved front facing the city. Ist facade is covered in a red-orange brick and corrugated metal panels. The curved face of the theatre is faced with white marble punctuated by large windows that provide panoramic views of the river from the curved interior foyers and multi-level terraces.

Next to the Stopera is the Joods Verzetsmonument, a 1988 monument to the Jewish victims of World War II. A remembrance of the Kristallnacht is held at the monument every year.

History

The construction of the Stopera was at least 60 years in the making. As early as 1915, discussions were held about building a new opera house as well as a new city hall. Various sites were considered for the new city hall, until they finally chose an expansive area of the Jewish district which had been largely abandoned during the late 1940s as ist occupants were deported to concentration camps.

The Amsterdam city council established a commission in 1955 to create a design with the architectural firm of Berghoef and Vegter. After almost ten years, the council rejected their final proposal in 1964 and held a competition in 1967 for a new design. The council selected a design by Viennese architect Wilhelm Holzbauer. However, plans for the new city hall were delayed again by budget constraints, as were the opera house plans.

In 1979, it was proposed that the city hall and opera house should be combined into one complex. The opera and the Dutch National Ballet would have a shared performance space. In 1980 the Amsterdam city council approved the new design by Cees Dam and Wilhelm Holzbauer. Approval from the provincial and national governments followed in 1981.

The Stopera was a controversial project that met with heavy protests, particularly from the local counterculture and leftwing groups like the squatter movement and Provo movement, leading to riots when construction began in 1982. The project went seriously over budget and the final cost was 112 million Dutch guilders more than originally budgeted.

The opera officially opened on September 23, 1986; the new city hall opened two years later.

Text imported from Wikipedia article "Stopera" and modified on 23 July 2019 under the CC-BY-SA 3.0 license.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20052304
  • Published on:
    23/01/2010
  • Last updated on:
    16/05/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine