• de
  • en
  • fr
  • International Database and Gallery of Structures

Share

Follow

Donate

Stephanitor Bridge (Rail)

General Information

Beginning of works: 2005
Completion: 2006
Status: in use

Project Type

Structure: U-shaped girder bridge
Function / usage: Railroad (railway) bridge

Location

Location: , ,
See also: Stephanitor Bridge (Road) (2006)
Coordinates: 53° 4' 58.04" N    8° 47' 29.75" E

Technical Information

Dimensions

total length 56.25 m
span lengths 13.02 m - 30.21 m - 13.02 m
deck width 13.1 m
bridge surface 773 m²
height above valley floor or water 6.2 - 6.6 m
girder depth 0.81 - 3.60 m
longitudinal slope ca. 0.1 - 0.2%
crossing angle 52.6 gon

Quantities

structural steel 161 t

Design Loads

live load LM 71; LM SW/2

Participants

Owner
Client
Design
Structural engineering
Contractor
Steel construction

Relevant Web Sites

Relevant Publications

  • Janberg, Nicolas / Krontal, Ludolf (2014): Eisenbahnbrücken. Wilhelm Ernst & Sohn Verlag für Architektur & technische Wissenschaften GmbH & Co. KG, Berlin (Germany), ISBN 978-3-433-03097-4, pp. 104.
  • About this
    data sheet
  • Structure-ID
    20065914
  • Date created
    27/01/2014
  • Last Update
    05/02/2016