Advertisement

Share

Follow

Stadtilm Viaduct

General Information

Name in local language: Ilmtalbrücke Stadtilm
Beginning of works: February 2015
Completion: November 2017
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Ilm River
Coordinates: 50° 45' 39.26" N    11° 3' 8.45" E
Show coordinates on a map

Technical Information

Dimensions

total length 630 m
span lengths 32.50 m - 5 x 39.50 m - 47.50 m - 75.00 m - 47.50 m - 5-x 39.50 m - 32.50 m
horizontal radius of curvature 1 140 m
bridge surface 7 308 m²
number of lanes 2 x 1
deck girder depth 1.92 m
roadway / carriageway width 8.00 m
longitudinal slope 0.7 %
superelevation 4.0 %
piers width max. 4.40 m
height 5.72 - 15.00 m
thickness 1.50 m
pile caps width 6.00 m
length 10.00 m
thickness 1.70 m
superstructure deck width 11.60 m

Quantities

foundations concrete volume 2 000 m³
reinforcing steel 350 t
substructure concrete volume 2 000 m³
reinforcing steel 315 t
superstructure concrete volume 7 400 m³
prestressing steel 275 t
reinforcing steel 1 100 t

Design Loads

design code(s) DIN EN 1991-2/NA

Cost

cost of construction Euro 12 000 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20077333
  • Date created
    30/04/2019
  • Last Update
    30/04/2019