Advertisement

Share

Follow

Donate

Spreebrücke Bautzen

General Information

Beginning of works: May 2010
Completion: January 2012
Duration of works: 18 months
Status: in use

Project Type

Location

Location: , , ,
Address: B 96n
Crosses:
  • Spree River
Coordinates: 51° 10' 18.47" N    14° 24' 37.58" E
Show coordinates on a map

Technical Information

Dimensions

total length 125.00 m
span lengths 19.00 m - 3 × 29.00 m - 19.00 m
horizontal radius of curvature 1 500 m
bridge surface 1 688 m²
piers diameter max. 1.80 m
superstructure deck depth 1.0 - 1.80 m
deck width 13.35 - 14.89 m
on-center distance between girders 5.00 m

Quantities

substructure concrete volume 528 m³
reinforcing steel 95 t
superstructure concrete volume 1 495 m³
prestressing steel 43 t
reinforcing steel 166 t

Cost

cost of construction Euro 2 650 000

Materials

superstructure prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Advertisement

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064689
  • Date created
    06/03/2013
  • Last Update
    25/03/2018