0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Unterflurtrasse Speltenbach
Beginning of works: 2019
Completion: 2023
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , ,
Part of:
Coordinates: 47° 4' 24.09" N    16° 4' 41.53" E
Coordinates: 47° 4' 35.56" N    16° 3' 51.32" E
Show coordinates on a map

Technical Information

Dimensions

length 1 000 m

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20077183
  • Published on:
    04/04/2019
  • Last updated on:
    04/04/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine