• de
  • en
  • fr
  • International Database and Gallery of Structures

SNAM Pipeline Bridge

General Information

Beginning of works: 1968
Completion: 1969
Status: in use

Project Type

Structure: U-shaped girder bridge
Function / usage: Pipeline bridge
Construction method: Incremental launching
Material: Prestressed concrete bridge

Location

Location: , , ,

Technical Information

Dimensions

width 4.60 m
total length 1 362 m
span lengths 38 x 35.84 m
pier height 10 - 15 m
deck deck depth 2.12 m

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Participants

Design
Co-contractor
Prestressing
Launching

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20011013
  • Date created
    14/12/2003
  • Last Update
    05/02/2016