Advertisement

Share

Follow

Donate

Siggenthalerbrücke

General Information

Beginning of works: Winter 1999
Completion: Fall 2001
Status: in use

Project Type

Structure: Deck arch bridge
Function / usage: Road bridge
Construction method: In-situ casting on falsework
Material: Reinforced concrete bridge

Location

Location: , ,
, ,
Crosses:
  • Limmat
Coordinates: 47° 29' 2.12" N    8° 17' 57.46" E
Show coordinates on a map

Technical Information

Dimensions

total length 213.7 m
arch rise 25.4 m
span 117.3 m
deck width 19.09 m
span lengths 22.00 m - 2 x 24.50 m - 21.00 m - 16.80 m - 13.40 m - 22.00 m - 11.80 m - 13.40 m - 16.80 m - 21.00 m - 23.50 m
girder depth 1.84 m
roadway / carriageway width 14.25 m
walkway width 2 x 2.42 m

Cost

cost of construction ca. Swiss Franc 15 000 000

Materials

deck prestressed concrete
piers reinforced concrete
arch reinforced concrete
piers on arch reinforced concrete

Advertisement

Participants

Design
Co-contractor
Prestressing
Bearings
Expansion joints

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20012214
  • Date created
    25/05/2004
  • Last Update
    10/02/2018